The video of starch flash dryer

Cassava processing video / Chat online / Give me a price

Starch flash dryer application:

The starch flash dryer is used for drying the wet potato starch, cassava starch, sweet potato starch, wheat starch and other starch and modified starch after the dehydration. The starch flash dryer also can be used to continuously dry other granular thermo-sensitive materials.

Features of starch flash dryer:

(1)Short time of materials retention, high heat-exchange rate, realization of instantly drying;

(2) The special cyclone recovery device to ensure the minimum loss of dry starch;

(3) The special designed cooling system of starch flash dryer makes the starch not easy agglomerate and the residual moisture can be precisely controlled;

(4) The new pass wind screw replaces the traditional shut wind screw, the effect is well and the failure rate is low;

(5) Without massive moving parts, low cost in operation and maintenance.

contact us

  • Do you want to buy machine?
  • Yes, I want to buy machine
  • No, I want to learn more in advance.
  • What is your raw material?
  • Cassava
  • Potato
  • Sweet potato
  • Other:
  • What is the final product you want to produce?
  • Chips
  • Flour
  • Starch
  • What is the final product you want to produce?
  • Garri
  • Cassava flour
  • Cassava starch
  • Cassava chips
  • Attiekie
  • Bammy
  • Other:
  • What is your planned capacity for final product?
  • <1 ton per day
  • 1 ton per day
  • 2 tons per day
  • 3 tons per day
  • 3-10 tons per da
  • 10-20 tons per day
  • >20 tons per day
  • What is the usage of your cassava chips?
  • Food usage (like fried chips, flour)
  • Industrial usage (like animal feeds, ethanol)
  • What is your planned capacity for final product?
  • <5 ton per hour
  • 5-10 tons per hour
  • >10 tons per hour
  • What is your planned capacity for final product?
  • <500 kg per hour
  • 0.5-5 ton per hour
  • 5-10 ton per hour
  • >10 ton per hour
  • What is your planned capacity for final product?
  • <300 kg per hour
  • 300-1000 kg per hour
  • 1-5 ton per hour
  • 5-10 ton per hour
  • >10 ton per hour

DOING online service

Call free

We will call back soonly,this is free for you,please add the area code